Construction equipment√

Taxonomy

Code

Scope note(s)

Source note(s)

Display note(s)

Hierarchical terms

Construction equipment√

Equivalent terms

Construction equipment√

Associated terms

Construction equipment√

51 Archival description results for Construction equipment√

51 results directly related Exclude narrower terms

Livestock Pavilion - Construction

Progress shot of construction of the Livestock Pavilion.

Bio/Historical Note: The Livestock Pavilion, one of the five original campus buildings, was designed by Brown and Vallance and constructed between 1910-1912. Built of red brick, slate and translucent glass panels (some of which could be opened for ventilation), it included a large show arena with seating. The Pavilion had a slaughter room and cold storage for the butchery courses. It was demolished in 1986.

Livestock Pavilion - Construction

Looking southeast at final stages of construction of the Livestock Pavilion; Main Barn construction visible at left.

Bio/Historical Note: The Livestock Pavilion, one of the five original campus buildings, was designed by Brown and Vallance and constructed between 1910-1912. Built of red brick, slate and translucent glass panels (some of which could be opened for ventilation), it included a large show arena with seating. The Pavilion had a slaughter room and cold storage for the butchery courses. It was demolished in 1986.

Livestock Pavilion - Construction

View looking northwest of the Livestock Pavilion; blurry piece of machinery visible in foreground.

Bio/Historical Note: The Livestock Pavilion, one of the five original campus buildings, was designed by Brown and Vallance and constructed between 1910-1912. Built of red brick, slate and translucent glass panels (some of which could be opened for ventilation), it included a large show arena with seating. The Pavilion had a slaughter room and cold storage for the butchery courses. It was demolished in 1986.

Medicine - Construction

College of Medicine at the University of Saskatchewan under construction.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health on May 1955. The name was officially changed to Royal University Hospital 23 May 1990.

Results 16 to 30 of 51