Item A-9078 - Engineering Building - Addition - Construction

Title and statement of responsibility area

Title proper

Engineering Building - Addition - Construction

General material designation

  • Graphic material

Parallel title

Other title information

Title statements of responsibility

Title notes

Level of description

Item

Reference code

A-9078

Edition area

Edition statement

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Dates of creation area

Date(s)

  • May 1979 (Creation)

Physical description area

Physical description

4 negatives : b&w ; 5.5 x 5.5 cm

Publisher's series area

Title proper of publisher's series

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archival description area

Custodial history

Scope and content

Images of the addition to the Engineering Building under construction.

Bio/Historical Note: In the late 1970s the Engineering Building would go through drastic renovations. In six stages from 1977 to 1983 the entire building was completely overhauled and redesigned. It encompassed the replacement of the original portion of the single storey west wing, the removal of the Storage Building, the construction of additions, and renovations in what remained of the original building. The architectural firm responsible for this redesign was Forrester, Scott and Bowers, and the total cost of the project would eventually surpass $13 million. The reconstruction began in 1977. It included the demolition of the old central heating and power plant, the construction of additions to house the Hardy Lab and central shops, and the relocation of a small section serving the Department of Geological Sciences. The second phase included the demolition of a one-storey wing of the building which adjoined the Hardy Lab, and its replacement with a larger three-story structure. A second storey was then built over the office section of the Hardy Lab, which was also renovated. The first phase of demolition work was carried out by CEL Contracting for $136,000 while the second was performed by Roscoe Enterprises for $39,626. The majority of the reconstruction itself was performed by Cana Construction for $1,012,730.

Notes area

Physical condition

Immediate source of acquisition

Arrangement

Language of material

Script of material

Location of originals

Availability of other formats

Restrictions on access

There are no restrictions on access.

Terms governing use, reproduction, and publication

Photographer: Unknown

Copyright holder: Unknown

Copyright expires: Unknown

Other terms: The researcher is responsible for obtaining copyright permission.

Finding aids

Associated materials

Related materials

Accruals

Location note

Neg. Vol. 12

Alternative identifier(s)

Standard number area

Standard number

Access points

Subject access points

Place access points

Genre access points

Control area

Accession area

Related subjects

Related people and organizations

Related places

Related genres