Campus - Scenic

Elevated view looking northwest at University buildings: Murray Memorial (Main) Library at left, Qu'Appelle Hall at centre; Administration Building in background. Image taken from the upper part of the Medical College Building.

Campus - Scenic

Two images on card stock. Image 1: "The "Bowl" Looking West" with north wing of Murray Memorial (Main) Library at left, Chemistry and Arts buildings in background. Image 2: "Looking East from the Arts Building" with elevated view of buildings from l to r: Chemistry, Biology, Physics, Administration and Physics buildings and north wing of Murray Memorial (Main) Library.

Division of Facilities Management fonds

  • RG 2015
  • Fonds
  • 1908-2015

This fonds contains building files from the early years of the University (1916-1949). These files include correspondence with the architect, contractor, superintendent of buildings, architect's representative as well as progress estimates, reports on work completed, and inspection reports. Also included are approximately 1300 slides detailing every element of the original administration building and architectural drawings of campus buildings and a computer tape backup of the scanned architectural plans and drawings.

University of Saskatchewan. Division of Facilities Management

Fritz Stehwien fonds

  • MG 333
  • Fonds
  • 1969-1993

This fonds contains 11 artworks of Saskatoon and the University campus by Fritz Stehwien.

Stehwien, Fritz, 1914-2008. (artist)

Geology Building - Construction

Looking northwest across the Bowl at the Geology Building under construction.

Bio/Historical Note: The construction of the Geology Building marked a return to the early style of campus architecture. The Department of Geology had been formed in 1927 and for the next six decades was based in the east wing of the Engineering Building. A growing faculty and student population had forced the department to cobble together makeshift accommodation in trailers and remote campus buildings. Designed by the architectural firm Black, McMillan and Larson of Regina, the building was given a neo-Collegiate Gothic exterior to blend harmoniously with the other buildings in the central campus. The two-and-a-half-storey building was erected just south or the Bowl side of the W.P. Thompson Biology Building, providing 8,543 square metres for office, laboratory, library, classroom, and storage space for rock and fossil samples. The exterior was clad with greystone and dressed with tyndal limestone. The dominant feature of the interior was a two-story atrium that featured the mosaics for the former exterior walls of the Thompson Building, a life-size skeleton of a Tyrannosaurus rex and geological and biological displays. The $18.5 million Geology Building was completed in 1988 and fused the space between Physics and Biology and linked, through a walkway, with Chemistry, creating an integrated science complex on campus.

Geology Building - Construction

Construction nearing completion of the Geology Building; winter scene.

Bio/Historical Note: The construction of the Geology Building marked a return to the early style of campus architecture. The Department of Geology had been formed in 1927 and for the next six decades was based in the east wing of the Engineering Building. A growing faculty and student population had forced the department to cobble together makeshift accommodation in trailers and remote campus buildings. Designed by the architectural firm Black, McMillan and Larson of Regina, the building was given a neo-Collegiate Gothic exterior to blend harmoniously with the other buildings in the central campus. The two-and-a-half-storey building was erected just south or the Bowl side of the W.P. Thompson Biology Building, providing 8,543 square metres for office, laboratory, library, classroom, and storage space for rock and fossil samples. The exterior was clad with greystone and dressed with tyndal limestone. The dominant feature of the interior was a two-story atrium that featured the mosaics for the former exterior walls of the Thompson Building, a life-size skeleton of a Tyrannosaurus Rex and geological and biological displays. The $18.5 million Geology Building was completed in 1988 and fused the space between Physics and Biology and linked, through a walkway, with Chemistry, creating an integrated science complex on campus.

Geology Building - Exterior

Geology Building in winter; students walking in foreground.

Bio/Historical Note: The construction of the Geology Building marked a return to the early style of campus architecture. The Department of Geology had been formed in 1927 and for the next six decades was based in the east wing of the Engineering Building. A growing faculty and student population had forced the department to cobble together makeshift accommodation in trailers and remote campus buildings. Designed by the architectural firm Black, McMillan and Larson of Regina, the building was given a neo-Collegiate Gothic exterior to blend harmoniously with the other buildings in the central campus. The two-and-a-half-storey building was erected just south or the Bowl side of the W.P. Thompson Biology Building, providing 8,543 square metres for office, laboratory, library, classroom, and storage space for rock and fossil samples. The exterior was clad with greystone and dressed with tyndal limestone. The dominant feature of the interior was a two-story atrium that featured the mosaics for the former exterior walls of the Thompson Building, a life-size skeleton of a Tyrannosaurus rex and geological and biological displays. The $18.5 million Geology Building was completed in 1988 and fused the space between Physics and Biology and linked, through a walkway, with Chemistry, creating an integrated science complex on campus.