Showing 78 results

Archival description
University of Saskatchewan - W.P. Thompson (Biology) Building√
Print preview View:

66 results with digital objects Show results with digital objects

School of Environment and Sustainability - Community Garden - Demolition

Garden plot behind the Biology Building, also known as the School of Environment and Sustainability community garden, being demolished. Image looking south towards the back of the Biology Building. Tunnel connecting the Agriculture Building to the Biology Building visible.

Historical note: This garden plot was also used to be used to grow research plants for the Biology department. The garden was removed for construction on a new building.

Department of Biology Building - Construction

Stone masons work among boulders in front of the steel skeleton of the Biology Building.

Bio/Historical Note: The W.P. Thompson Biology Building is named after Walter Palmer Thompson, the University of Saskatchewan's third president and founder of the Biology Department (1913). Designed by Izumi, Arnott and Sugiyama, it was constructed between 1957 and 1959 and officially opened in 1960. Set back from the Bowl, the flat-roofed cube style building was located between the Collegiate Gothic architecture of the Chemistry and Physics Buildings. It originally consisted of a teaching wing and a research wing but a header and greenhouse complex was added in 1962. Unlike many other Canadian universities the Department of Biology remained a single unit, balancing diverse sub-disciplines rather than separating into several distinct departments. Prior to the building's opening in 1960, work in biological sciences was scattered among four campus locations. Perhaps the most striking of the building’s features is the mural of mosaic tiles that adorns the south and west exterior walls. The mural depicts the four main stages of cellular mitosis. The artist, Roy Kiyooka, chose chromosome patterns as a testament to Dr. Thompson's important discoveries regarding the genetics of wheat rust. In 1986, the Geology Building was completed on the south side of Biology, resulting in the transformation of the south façade from an exterior into an interior wall, part of a new atrium.

Department of Biology Building - Construction

A truck delivers cement to the Biology Building construction site.

Bio/Historical Note: The W.P. Thompson Biology Building is named after Walter Palmer Thompson, the University of Saskatchewan's third president and founder of the Biology Department (1913). Designed by Izumi, Arnott and Sugiyama, it was constructed between 1957 and 1959 and officially opened in 1960. Set back from the Bowl, the flat-roofed cube style building was located between the Collegiate Gothic architecture of the Chemistry and Physics Buildings. It originally consisted of a teaching wing and a research wing but a header and greenhouse complex was added in 1962. Unlike many other Canadian universities the Department of Biology remained a single unit, balancing diverse sub-disciplines rather than separating into several distinct departments. Prior to the building's opening in 1960, work in biological sciences was scattered among four campus locations. Perhaps the most striking of the building’s features is the mural of mosaic tiles that adorns the south and west exterior walls. The mural depicts the four main stages of cellular mitosis. The artist, Roy Kiyooka, chose chromosome patterns as a testament to Dr. Thompson's important discoveries regarding the genetics of wheat rust. In 1986, the Geology Building was completed on the south side of Biology, resulting in the transformation of the south façade from an exterior into an interior wall, part of a new atrium.

Department of Biology Building - Construction

Winter view looking south at final stages of construction of the Biology Building.

Bio/Historical Note: The W.P. Thompson Biology Building is named after Walter Palmer Thompson, the University of Saskatchewan's third president and founder of the Biology Department (1913). Designed by Izumi, Arnott and Sugiyama, it was constructed between 1957 and 1959 and officially opened in 1960. Set back from the Bowl, the flat-roofed cube style building was located between the Collegiate Gothic architecture of the Chemistry and Physics Buildings. It originally consisted of a teaching wing and a research wing but a header and greenhouse complex was added in 1962. Unlike many other Canadian universities the Department of Biology remained a single unit, balancing diverse sub-disciplines rather than separating into several distinct departments. Prior to the building's opening in 1960, work in biological sciences was scattered among four campus locations. Perhaps the most striking of the building’s features is the mural of mosaic tiles that adorns the south and west exterior walls. The mural depicts the four main stages of cellular mitosis. The artist, Roy Kiyooka, chose chromosome patterns as a testament to Dr. Thompson's important discoveries regarding the genetics of wheat rust. In 1986, the Geology Building was completed on the south side of Biology, resulting in the transformation of the south façade from an exterior into an interior wall, part of a new atrium.

Department of Biology Building - Official Opening

Elevated view of students dressed in Roman togas and outfits interrupting the ceremonies as dignitaries are seated behind and laughing during the official opening of the Biology Building.

Bio/Historical Note: The W.P. Thompson Biology Building is named after Walter Palmer Thompson, the University of Saskatchewan's third president and founder of the Biology Department (1913). Designed by Izumi, Arnott and Sugiyama, it was constructed between 1957 and 1959 and officially opened in 1960. Set back from the Bowl, the flat-roofed cube style building was located between the Collegiate Gothic architecture of the Chemistry and Physics Buildings. It originally consisted of a teaching wing and a research wing but a header and greenhouse complex was added in 1962. Unlike many other Canadian universities the Department of Biology remained a single unit, balancing diverse sub-disciplines rather than separating into several distinct departments. Prior to the building's opening in 1960, work in biological sciences was scattered among four campus locations. Perhaps the most striking of the building’s features is the mural of mosaic tiles that adorns the south and west exterior walls. The mural depicts the four main stages of cellular mitosis. The artist, Roy Kiyooka, chose chromosome patterns as a testament to Dr. Thompson's important discoveries regarding the genetics of wheat rust. In 1986, the Geology Building was completed on the south side of Biology, resulting in the transformation of the south façade from an exterior into an interior wall, part of a new atrium.

Department of Biology Building - Official Opening

View of the crowd in the lecture theatre during the official opening of the W.P. Thompson Biology Building.

Bio/Historical Note: The W.P. Thompson Biology Building is named after Walter Palmer Thompson, the University of Saskatchewan's third president and founder of the Biology Department (1913). Designed by Izumi, Arnott and Sugiyama, it was constructed between 1957 and 1959 and officially opened in 1960. Set back from the Bowl, the flat-roofed cube style building was located between the Collegiate Gothic architecture of the Chemistry and Physics Buildings. It originally consisted of a teaching wing and a research wing but a header and greenhouse complex was added in 1962. Unlike many other Canadian universities the Department of Biology remained a single unit, balancing diverse sub-disciplines rather than separating into several distinct departments. Prior to the building's opening in 1960, work in biological sciences was scattered among four campus locations. Perhaps the most striking of the building’s features is the mural of mosaic tiles that adorns the south and west exterior walls. The mural depicts the four main stages of cellular mitosis. The artist, Roy Kiyooka, chose chromosome patterns as a testament to Dr. Thompson's important discoveries regarding the genetics of wheat rust. In 1986, the Geology Building was completed on the south side of Biology, resulting in the transformation of the south façade from an exterior into an interior wall, part of a new atrium.

Campus - Scenic

Two images on card stock. Image 1: "The "Bowl" Looking West" with north wing of Murray Memorial (Main) Library at left, Chemistry and Arts buildings in background. Image 2: "Looking East from the Arts Building" with elevated view of buildings from l to r: Chemistry, Biology, Physics, Administration and Physics buildings and north wing of Murray Memorial (Main) Library.

Memorial Gates - Dedication Ceremony

Elevated view of University and civic officials standing at dedication service of Memorial Gates at centre; attendees standing in foreground. Union Jack draped over the Memorial Tablet. University buildings from l to r: Biology Building, Qu'Appelle Hall, Little Stone School House, and Emmanuel College. St. Andrew's College visible directly behind gates.

Results 1 to 15 of 78