Showing 217 results

Archival description
University of Saskatchewan - Arts Building√
Print preview View:

181 results with digital objects Show results with digital objects

Statues - Lesya Ukrainka

Image 1 is a view looking northwest of the 10-foot high bronze statue of Lesya Ukrainka, the celebrated Ukrainian poet; Arts Tower in background. Image 2 is a view taken from the foot of the statue looking up at it.

Bio/Historical Note: Lesya Ukrainka (Larysa Kosach-Kvitka) (1871-1913), the celebrated Ukrainian poet, made her mark on Ukrainian and world literature through her diverse writing talents. Her profound knowledge of world history and languages enabled her to write extensively across genres on a variety of subjects. In her lyrical works and dramatic poems, she vividly developed the themes of patriotism, human dignity, and personal integrity. Ukrainka’s work is timeless in its powerful assertion of human rights and freedoms. In 1976, a bronze statue of Lesya Ukrainka, made in Kyiv, Ukraine (USSR) by sculptor Halyna Kal’chenko and architect Anatoliy Ihnashchenko, was unveiled at the University of Saskatchewan. Commissioned by the Association for Cultural Relations with Ukrainians Abroad, the statue was at the time seen by some merely as Soviet propaganda designed to rehabilitate their international reputation tarnished, in part, by injustices perpetrated against the people of Ukraine. The gift was initially declined by both the Province of Saskatchewan and the City of Saskatoon before being accepted by the University of Saskatchewan and installed on campus in a grove south of the Arts Tower. Through a generous donation by Dr. Victor O. Buyniak, as well as through the support of alumni and the wider Ukrainian community, the statue was refurbished and unveiled in its present location on 1 August 2013, the centenary of the death of Lesya Ukrainka.

Biographical/historical note: A statue of Lesya Ukrainka, the celebrated Ukrainian poet, was presented to the U of S in 1976 by the Association for Cultural Relations with Ukrainians Abroad of the USSR as a gift of friendship from the people of Ukraine to the people of Canada.

College of Arts and Science Building - Architect's Model

Elevated view of model of the Arts Building with other buildings surrounding it.

Bio/Historical Note: As early as 1909 plans for an Arts Building were proposed for the University of Saskatchewan campus. In the early years of the University, David Brown and Hugh Vallance, the original campus architects, had in fact designed a building for the Humanities. The building was to have been named Haultain Hall after Sir Frederick Haultain, Premier of the North West Territories from 1891-1905 and Chancellor of the University of Saskatchewan from 1917-1940. Construction on Haultain Hall was to have commenced during the mid-1910s but the onset of World War I postponed construction. A decade later building plans were again foiled when on 13 March 1925 the original Engineering Building burned down. Efforts to rebuild the building as quickly as possible sapped what funds existed for construction and the Arts Building and several other projects were put on hold indefinitely. In 1929 University President Walter Murray launched a campaign for a building “ that would provide much needed space for Arts, biology, the School of Household Science, the College of Education, the School of Accounting, administrative offices, a small gym for women, a library, and a museum. The cost as of the summer of 1930 was estimated at $885,832." This third attempt to construct an Arts Building would also fall short when on 30 October, 1930 Premier Anderson wrote that the University would have to wait another year for funding. In 1933 Murray dared to ask again, at which point his request for funding was flatly denied. Finally in 1957 funding for the construction of an Arts building materialized. In that year the Canada Council provided a grant to the University of Saskatchewan for the construction of the Arts Building. In May 1957 University President Walter Thompson obtained an agreement from the Provincial Government to provide for one-half of the funds for the Arts Building.

College of Arts and Science Building - Architect's Sketch

Shore and Moffat's drawing of the proposed Arts Building.

Bio/Historical Note: As early as 1909 plans for an Arts Building were proposed for the University of Saskatchewan campus. In the early years of the University, David Brown and Hugh Vallance, the original campus architects, had in fact designed a building for the Humanities. The building was to have been named Haultain Hall after Sir Frederick Haultain, Premier of the North West Territories from 1891-1905 and Chancellor of the University of Saskatchewan from 1917-1940. Construction on Haultain Hall was to have commenced during the mid-1910s but the onset of World War I postponed construction. A decade later building plans were again foiled when on 13 March 1925 the original Engineering Building burned down. Efforts to rebuild the building as quickly as possible sapped what funds existed for construction and the Arts Building and several other projects were put on hold indefinitely. In 1929 University President Walter Murray launched a campaign for a building “ that would provide much needed space for Arts, biology, the School of Household Science, the College of Education, the School of Accounting, administrative offices, a small gym for women, a library, and a museum. The cost as of the summer of 1930 was estimated at $885,832." This third attempt to construct an Arts Building would also fall short when on 30 October, 1930 Premier Anderson wrote that the University would have to wait another year for funding. In 1933 Murray dared to ask again, at which point his request for funding was flatly denied. Finally in 1957 funding for the construction of an Arts building materialized. In that year the Canada Council provided a grant to the University of Saskatchewan for the construction of the Arts Building. In May 1957 University President Walter Thompson obtained an agreement from the Provincial Government to provide for one-half of the funds for the Arts Building.

College of Arts and Science Building - Construction

Elevated view of pilings put into place, lumber piles and equipment all around worksite. Vehicles lined up in foreground; classroom building in background.

Bio/Historical Note: The Arts Building was constructed in four major stages from 1958 to 1967 at a cost of $758,491. The first stage of construction began in September 1958 with the raising of the classroom wing. The classroom wing was constructed by W.C. Wells Construction, and was designed by Shore and Moffat. It was officially opened on 28 September 1959. The second phase of construction was completed in 1960. It involved the building of the first seven floors of the Arts Tower, the Arts Theatre, and a link joining the Tower to the classroom wing. The Arts Tower project was contracted to Bird Construction while design of the building was again carried out by Shore and Moffat. The Arts Tower was officially opened on 16 January 1961.The addition to the Arts Tower was constructed from 1963-1965 by Bird Construction. While the initial tower completed in 1960 had been designed to accommodate another three floors at a later date, by 1963-64 improvements in structural building techniques allowed the architectural firm of Shore and Moffat and Partners to add an eleventh floor to the building designs. The second classroom wing of the Arts Building was completed in 1967. This fourth and final phase of construction was built by W. C. Wells Construction and was again designed by the architectural firm of Shore and Moffat and Partners. The building on opening contained a gross area of finished space amounting to 82,980 square feet. In addition, 3,564 square feet of unfinished space was provided in the basement. Plans to adjoin the Addition to the planned Law-Commerce Complex were also included in the design. The building was considerably larger upon completion than initially planned, and included laboratory space as well as classrooms. On opening, the second classroom wing contained one 350-seat theatre, one 150-seat theatre, six 95 seat classrooms, six 45 seat classrooms and one 20 seat classroom as well as three departmental seminar rooms. In addition to these, four laboratory units were added to the building for Psychology, Geography, Languages and the Computation Centre. The second classroom wing was faced in tyndall limestone while the interior main corridors of the building were lined with painted concrete block. In 1974 a pedestrian connection was built to the Arts Building for $394,342. It was designed by BLM Architects, and was contracted to Poole Construction. Portions of the Arts Building, including the theatre, were renovated as part of the first phase of the Place Riel Project. This renovations were designed by D. H. Stock and Partners, and were contracted to Smith Bros. and Wilson. They were completed in 1976 for $178,080.

College of Arts and Science Building - Construction

Steel frame is up for five stories of the Arts Tower. Snow fencing, construction equipment and men working in foreground; classroom wing at left.

Bio/Historical Note: The Arts Building was constructed in four major stages from 1958 to 1967 at a cost of $758,491. The first stage of construction began in September 1958 with the raising of the classroom wing. The classroom wing was constructed by W.C. Wells Construction, and was designed by Shore and Moffat. It was officially opened on 28 September 1959. The second phase of construction was completed in 1960. It involved the building of the first seven floors of the Arts Tower, the Arts Theatre, and a link joining the Tower to the classroom wing. The Arts Tower project was contracted to Bird Construction while design of the building was again carried out by Shore and Moffat. The Arts Tower was officially opened on 16 January 1961.The addition to the Arts Tower was constructed from 1963-1965 by Bird Construction. While the initial tower completed in 1960 had been designed to accommodate another three floors at a later date, by 1963-64 improvements in structural building techniques allowed the architectural firm of Shore and Moffat and Partners to add an eleventh floor to the building designs. The second classroom wing of the Arts Building was completed in 1967. This fourth and final phase of construction was built by W. C. Wells Construction and was again designed by the architectural firm of Shore and Moffat and Partners. The building on opening contained a gross area of finished space amounting to 82,980 square feet. In addition, 3,564 square feet of unfinished space was provided in the basement. Plans to adjoin the Addition to the planned Law-Commerce Complex were also included in the design. The building was considerably larger upon completion than initially planned, and included laboratory space as well as classrooms. On opening, the second classroom wing contained one 350-seat theatre, one 150-seat theatre, six 95 seat classrooms, six 45 seat classrooms and one 20 seat classroom as well as three departmental seminar rooms. In addition to these, four laboratory units were added to the building for Psychology, Geography, Languages and the Computation Centre. The second classroom wing was faced in tyndall limestone while the interior main corridors of the building were lined with painted concrete block. In 1974 a pedestrian connection was built to the Arts Building for $394,342. It was designed by BLM Architects, and was contracted to Poole Construction. Portions of the Arts Building, including the theatre, were renovated as part of the first phase of the Place Riel Project. This renovations were designed by D. H. Stock and Partners, and were contracted to Smith Bros. and Wilson. They were completed in 1976 for $178,080.

College of Arts and Science Building - Construction

Floors are up and the roof of the tower is covered. Scaffolding beside the classroom wing (left), with vehicles, construction equipment and snow-fencing in foreground. Chemistry Building visible through frame in background.

Bio/Historical Note: The Arts Building was constructed in four major stages from 1958 to 1967 at a cost of $758,491. The first stage of construction began in September 1958 with the raising of the classroom wing. The classroom wing was constructed by W.C. Wells Construction, and was designed by Shore and Moffat. It was officially opened on 28 September 1959. The second phase of construction was completed in 1960. It involved the building of the first seven floors of the Arts Tower, the Arts Theatre, and a link joining the Tower to the classroom wing. The Arts Tower project was contracted to Bird Construction while design of the building was again carried out by Shore and Moffat. The Arts Tower was officially opened on 16 January 1961.The addition to the Arts Tower was constructed from 1963-1965 by Bird Construction. While the initial tower completed in 1960 had been designed to accommodate another three floors at a later date, by 1963-64 improvements in structural building techniques allowed the architectural firm of Shore and Moffat and Partners to add an eleventh floor to the building designs. The second classroom wing of the Arts Building was completed in 1967. This fourth and final phase of construction was built by W. C. Wells Construction and was again designed by the architectural firm of Shore and Moffat and Partners. The building on opening contained a gross area of finished space amounting to 82,980 square feet. In addition, 3,564 square feet of unfinished space was provided in the basement. Plans to adjoin the Addition to the planned Law-Commerce Complex were also included in the design. The building was considerably larger upon completion than initially planned, and included laboratory space as well as classrooms. On opening, the second classroom wing contained one 350-seat theatre, one 150-seat theatre, six 95 seat classrooms, six 45 seat classrooms and one 20 seat classroom as well as three departmental seminar rooms. In addition to these, four laboratory units were added to the building for Psychology, Geography, Languages and the Computation Centre. The second classroom wing was faced in tyndall limestone while the interior main corridors of the building were lined with painted concrete block. In 1974 a pedestrian connection was built to the Arts Building for $394,342. It was designed by BLM Architects, and was contracted to Poole Construction. Portions of the Arts Building, including the theatre, were renovated as part of the first phase of the Place Riel Project. This renovations were designed by D. H. Stock and Partners, and were contracted to Smith Bros. and Wilson. They were completed in 1976 for $178,080.

College of Arts and Science Building - Construction

Six floors are formed and in place. Scaffolding, equipment and vehicles in foreground.

Bio/Historical Note: The Arts Building was constructed in four major stages from 1958 to 1967 at a cost of $758,491. The first stage of construction began in September 1958 with the raising of the classroom wing. The classroom wing was constructed by W.C. Wells Construction, and was designed by Shore and Moffat. It was officially opened on 28 September 1959. The second phase of construction was completed in 1960. It involved the building of the first seven floors of the Arts Tower, the Arts Theatre, and a link joining the Tower to the classroom wing. The Arts Tower project was contracted to Bird Construction while design of the building was again carried out by Shore and Moffat. The Arts Tower was officially opened on 16 January 1961.The addition to the Arts Tower was constructed from 1963-1965 by Bird Construction. While the initial tower completed in 1960 had been designed to accommodate another three floors at a later date, by 1963-64 improvements in structural building techniques allowed the architectural firm of Shore and Moffat and Partners to add an eleventh floor to the building designs. The second classroom wing of the Arts Building was completed in 1967. This fourth and final phase of construction was built by W. C. Wells Construction and was again designed by the architectural firm of Shore and Moffat and Partners. The building on opening contained a gross area of finished space amounting to 82,980 square feet. In addition, 3,564 square feet of unfinished space was provided in the basement. Plans to adjoin the Addition to the planned Law-Commerce Complex were also included in the design. The building was considerably larger upon completion than initially planned, and included laboratory space as well as classrooms. On opening, the second classroom wing contained one 350-seat theatre, one 150-seat theatre, six 95 seat classrooms, six 45 seat classrooms and one 20 seat classroom as well as three departmental seminar rooms. In addition to these, four laboratory units were added to the building for Psychology, Geography, Languages and the Computation Centre. The second classroom wing was faced in tyndall limestone while the interior main corridors of the building were lined with painted concrete block. In 1974 a pedestrian connection was built to the Arts Building for $394,342. It was designed by BLM Architects, and was contracted to Poole Construction. Portions of the Arts Building, including the theatre, were renovated as part of the first phase of the Place Riel Project. This renovations were designed by D. H. Stock and Partners, and were contracted to Smith Bros. and Wilson. They were completed in 1976 for $178,080.

College of Arts and Science Building - Construction

Elevated view of six floors formed of new Arts Tower; scaffolding, equipment and vehicles in foreground.

Bio/Historical Note: The Arts Building was constructed in four major stages from 1958 to 1967 at a cost of $758,491. The first stage of construction began in September 1958 with the raising of the classroom wing. The classroom wing was constructed by W.C. Wells Construction, and was designed by Shore and Moffat. It was officially opened on 28 September 1959. The second phase of construction was completed in 1960. It involved the building of the first seven floors of the Arts Tower, the Arts Theatre, and a link joining the Tower to the classroom wing. The Arts Tower project was contracted to Bird Construction while design of the building was again carried out by Shore and Moffat. The Arts Tower was officially opened on 16 January 1961.The addition to the Arts Tower was constructed from 1963-1965 by Bird Construction. While the initial tower completed in 1960 had been designed to accommodate another three floors at a later date, by 1963-64 improvements in structural building techniques allowed the architectural firm of Shore and Moffat and Partners to add an eleventh floor to the building designs. The second classroom wing of the Arts Building was completed in 1967. This fourth and final phase of construction was built by W. C. Wells Construction and was again designed by the architectural firm of Shore and Moffat and Partners. The building on opening contained a gross area of finished space amounting to 82,980 square feet. In addition, 3,564 square feet of unfinished space was provided in the basement. Plans to adjoin the Addition to the planned Law-Commerce Complex were also included in the design. The building was considerably larger upon completion than initially planned, and included laboratory space as well as classrooms. On opening, the second classroom wing contained one 350-seat theatre, one 150-seat theatre, six 95 seat classrooms, six 45 seat classrooms and one 20 seat classroom as well as three departmental seminar rooms. In addition to these, four laboratory units were added to the building for Psychology, Geography, Languages and the Computation Centre. The second classroom wing was faced in tyndall limestone while the interior main corridors of the building were lined with painted concrete block. In 1974 a pedestrian connection was built to the Arts Building for $394,342. It was designed by BLM Architects, and was contracted to Poole Construction.

College of Arts and Science Building - Construction

Elevated view of the six floors that are formed and mainly covered. "Bird" sign on scaffolding, equipment and vehicles in foreground.

Bio/Historical Note: The Arts Building was constructed in four major stages from 1958 to 1967 at a cost of $758,491. The first stage of construction began in September 1958 with the raising of the classroom wing. The classroom wing was constructed by W.C. Wells Construction, and was designed by Shore and Moffat. It was officially opened on 28 September 1959. The second phase of construction was completed in 1960. It involved the building of the first seven floors of the Arts Tower, the Arts Theatre, and a link joining the Tower to the classroom wing. The Arts Tower project was contracted to Bird Construction while design of the building was again carried out by Shore and Moffat. The Arts Tower was officially opened on 16 January 1961.The addition to the Arts Tower was constructed from 1963-1965 by Bird Construction. While the initial tower completed in 1960 had been designed to accommodate another three floors at a later date, by 1963-64 improvements in structural building techniques allowed the architectural firm of Shore and Moffat and Partners to add an eleventh floor to the building designs. The second classroom wing of the Arts Building was completed in 1967. This fourth and final phase of construction was built by W. C. Wells Construction and was again designed by the architectural firm of Shore and Moffat and Partners. The building on opening contained a gross area of finished space amounting to 82,980 square feet. In addition, 3,564 square feet of unfinished space was provided in the basement. Plans to adjoin the Addition to the planned Law-Commerce Complex were also included in the design. The building was considerably larger upon completion than initially planned, and included laboratory space as well as classrooms. On opening, the second classroom wing contained one 350-seat theatre, one 150-seat theatre, six 95 seat classrooms, six 45 seat classrooms and one 20 seat classroom as well as three departmental seminar rooms. In addition to these, four laboratory units were added to the building for Psychology, Geography, Languages and the Computation Centre. The second classroom wing was faced in tyndall limestone while the interior main corridors of the building were lined with painted concrete block. In 1974 a pedestrian connection was built to the Arts Building for $394,342. It was designed by BLM Architects, and was contracted to Poole Construction. Portions of the Arts Building, including the theatre, were renovated as part of the first phase of the Place Riel Project. This renovations were designed by D. H. Stock and Partners, and were contracted to Smith Bros. and Wilson. They were completed in 1976 for $178,080.

College of Arts and Science Building - Construction

Elevated view of roof of classroom wing of new Arts Building. Cars lined up in background and along front of building.

Bio/Historical Note: The Arts Building was constructed in four major stages from 1958 to 1967 at a cost of $758,491. The first stage of construction began in September 1958 with the raising of the classroom wing. The classroom wing was constructed by W.C. Wells Construction, and was designed by Shore and Moffat. It was officially opened on 28 September 1959. The second phase of construction was completed in 1960. It involved the building of the first seven floors of the Arts Tower, the Arts Theatre, and a link joining the Tower to the classroom wing. The Arts Tower project was contracted to Bird Construction while design of the building was again carried out by Shore and Moffat. The Arts Tower was officially opened on 16 January 1961.The addition to the Arts Tower was constructed from 1963-1965 by Bird Construction. While the initial tower completed in 1960 had been designed to accommodate another three floors at a later date, by 1963-64 improvements in structural building techniques allowed the architectural firm of Shore and Moffat and Partners to add an eleventh floor to the building designs. The second classroom wing of the Arts Building was completed in 1967. This fourth and final phase of construction was built by W. C. Wells Construction and was again designed by the architectural firm of Shore and Moffat and Partners. The building on opening contained a gross area of finished space amounting to 82,980 square feet. In addition, 3,564 square feet of unfinished space was provided in the basement. Plans to adjoin the Addition to the planned Law-Commerce Complex were also included in the design. The building was considerably larger upon completion than initially planned, and included laboratory space as well as classrooms. On opening, the second classroom wing contained one 350-seat theatre, one 150-seat theatre, six 95 seat classrooms, six 45 seat classrooms and one 20 seat classroom as well as three departmental seminar rooms. In addition to these, four laboratory units were added to the building for Psychology, Geography, Languages and the Computation Centre. The second classroom wing was faced in tyndall limestone while the interior main corridors of the building were lined with painted concrete block. In 1974 a pedestrian connection was built to the Arts Building for $394,342. It was designed by BLM Architects, and was contracted to Poole Construction. Portions of the Arts Building, including the theatre, were renovated as part of the first phase of the Place Riel Project. This renovations were designed by D. H. Stock and Partners, and were contracted to Smith Bros. and Wilson. They were completed in 1976 for $178,080.

Results 1 to 15 of 217