Construction equipment√

Taxonomía

Código

Nota(s) sobre el alcance

Nota(s) sobre el origen

Mostrar nota(s)

Términos jerárquicos

Construction equipment√

Términos equivalentes

Construction equipment√

Términos asociados

Construction equipment√

51 Archival description results for Construction equipment√

51 resultados directamente relacionados Excluir términos relacionados

University Hospital - Addition Construction

Construction of University Hospital addition.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health, on May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

University Hospital - Construction

Looking northwest toward main entrance of new University Hospital.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health, on May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

University Hospital - Wing Construction

View of a wing of University Hospital under construction. One worker on ground on front of scaffolding; one worker perched on scaffolding.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health on May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

University Hospital - Wing Construction

View of a wing of University Hospital under construction. Crane at left.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health on May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

Septic Tank Construction

Crew of nine men and two horses pose for the camera. Part of South Saskatchewan riverbank has been excavated with wood framed structure under construction. CPR bridge in background. Stamped signature of A.R. Greig on back of photograph. "Septic tank on river bank" written on back.

Livestock Pavilion - Construction

Looking southeast at final stages of construction of the Livestock Pavilion; Main Barn construction visible at left.

Bio/Historical Note: The Livestock Pavilion, one of the five original campus buildings, was designed by Brown and Vallance and constructed between 1910-1912. Built of red brick, slate and translucent glass panels (some of which could be opened for ventilation), it included a large show arena with seating. The Pavilion had a slaughter room and cold storage for the butchery courses. It was demolished in 1986.

Administration Building - Addition - Construction

View looking north of concrete skeleton of the Administration Building addition. Sign in front of building reads: "Penn-Co construction". Sign below it reads: "Saskatchewan Builds - Administration Building - Alternate Accommodation - Opening Spring 1987 $5.6 million project 125 years of employment in construction and service industry 'Partnership for Progress'."

Bio/Historical Note: In 1979 portions of the Administration Building (College Building) were declared unsafe. The building that had been at the heart of University life for seven decades was showing its age. A weak roof structure and deteriorating cement precipitated action on the part of the University’s administration. From a number of options available, the choice was made to build a new building adjacent to the original structure. The Administration Building Addition (East Wing) was opened in October 1987, construction having began in the fall of 1985. Designed by Wiens Johnstone Architects of Regina and built by Penn-Co Construction of Calgary, the $6.6 million three-story stone-clad building contained 4,646 square metres of floor space, approximately the same office space as the College Building. The two buildings were directly linked with some of the College Building’s exterior walls in the addition’s interior space.

Administration Building - Addition - Construction

View looking south of concrete skeleton of the Administration Building addition.

Bio/Historical Note: In 1979 portions of the Administration Building (College Building) were declared unsafe. The building that had been at the heart of University life for seven decades was showing its age. A weak roof structure and deteriorating cement precipitated action on the part of the University’s administration. From a number of options available, the choice was made to build a new building adjacent to the original structure. The Administration Building Addition (East Wing) was opened in October 1987, construction having began in the fall of 1985. Designed by Wiens Johnstone Architects of Regina and built by Penn-Co Construction of Calgary, the $6.6 million three-story stone-clad building contained 4,646 square metres of floor space, approximately the same office space as the College Building. The two buildings were directly linked with some of the College Building’s exterior walls in the addition’s interior space.

University Hospital - Early Construction

Elevated view looking west at early stages of foundation construction.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948-1955 by Smith Bros. and Wilson, contractors, at a cost of $7 million, the 6-storey, 7-wing University Hospital was officially opened by T.J. Bentley, Saskatchewan Minister of Health, in May 1955. The name was officially changed to Royal University Hospital on 23 May 1990.

Resultados 16 a 30 de 51