- RG2024-2006-086-1744
- Pièce
- [198-]
Fait partie de Educational Media Access and Production (EMAP) fonds
Education Building (south side) main entrance; Winter.
Fait partie de Educational Media Access and Production (EMAP) fonds
Education Building (south side) main entrance; Winter.
Fait partie de University of Saskatchewan Photograph Collection
Looking west at the Education Building. In foreground are a parking lot full of cars and trees.
Fait partie de University of Saskatchewan Photograph Collection
View looking southeast of Education Building; landscaping and roads in foreground.
Fait partie de University of Saskatchewan Photograph Collection
Sculpture representing four large circles resting on each other on stands, situated at the Education Building.
Fait partie de University of Saskatchewan Photograph Collection
Elevated view looking northwest at Education Building. Winter scene; image taken from Commerce Building.
Fait partie de University of Saskatchewan Photograph Collection
Looking southwest at new Education Building; landscape in foreground.
College of Education Building - Construction
Fait partie de University of Saskatchewan Photograph Collection
Progress shot of Education Building under construction.
Bio/Historical Note: Upon completion in 1970, the Education Building contained seven standard classrooms as well as a number of special classrooms. The standard classrooms were built to accommodate 30 to 35 students and were designed to convert easily into two seminar rooms, or be combined with adjacent classrooms to form larger ones. The special rooms varied in size and included two large 100 seat classrooms, an intermediate size classroom accommodating 70 students, a social studies classroom for 32 to 36 people, a primary room and two mathematics classrooms of the same size, 16 seminar rooms seating 18 and a lecture theatre seating 325. A Science Instruction Centre in the building provides instruction in Methodology and subject matter in the fields of General Science, Physics, Chemistry and Biology. Included in the unit were two General Science laboratory-classrooms, a Physics and Chemistry laboratory-classroom, and a Biology laboratory-classroom, each with an intended capacity of 30 to 35 students. A Physical Education Centre is also located in the building. It consists of a 120' x 100' gymnasium with bleacher seating for 400 to 500 spectators, a 75' x 44' swimming pool, an equipment room, and men’s and women’s shower and locker rooms. The Instructional Resources Centre contains a Reserve Library initially of 10,000 volumes with study space for 400 students, a curriculum library of 2,000 volumes with study space for 300 students, and an Instructional Resources laboratory. The Education Television Centre in the building includes two small production studios, a conference room, a photographic dark room and laboratory, a large storage room, a graphic arts area and a mobile production unit garage. The Television Centre was initially meant to provide a central facility for the production of University programs “until such time as a separate facility for this purpose can be constructed”. Renovations to the building to accommodate the Music Department were completed prior to 1978 for $730,000. The renovations were designed by architects Forrester, Scott, Bowers, Cooper, and Walls. Tenders for the project were received on April 4, 1975 at which time the contract was awarded to Shoquist Construction. Renovations to the building envelope were completed in 1986 by R & D Construction for $325,918, and were designed by the architectural firm of Scott Bowers. A building envelope is and includes everything that separates the interior of a building from the outdoor environment, including the windows, walls, foundation, basement slab, ceiling, roof, and insulation. In 1990 further renovations to the building were completed by Inter-City Mechanical for $144,686.
College of Education Building - Architect's Model
Fait partie de University of Saskatchewan Photograph Collection
Architect's model of proposed Education Building.
Bio/Historical Note: Upon completion in 1970, the Education Building contained seven standard classrooms as well as a number of special classrooms. The standard classrooms were built to accommodate 30 to 35 students and were designed to convert easily into two seminar rooms, or be combined with adjacent classrooms to form larger ones. The special rooms varied in size and included two large 100 seat classrooms, an intermediate size classroom accommodating 70 students, a social studies classroom for 32 to 36 people, a primary room and two mathematics classrooms of the same size, 16 seminar rooms seating 18 and a lecture theatre seating 325. A Science Instruction Centre in the building provides instruction in Methodology and subject matter in the fields of General Science, Physics, Chemistry and Biology. Included in the unit were two General Science laboratory-classrooms, a Physics and Chemistry laboratory-classroom, and a Biology laboratory-classroom, each with an intended capacity of 30 to 35 students. A Physical Education Centre is also located in the building. It consists of a 120' x 100' gymnasium with bleacher seating for 400 to 500 spectators, a 75' x 44' swimming pool, an equipment room, and men’s and women’s shower and locker rooms. The Instructional Resources Centre contains a Reserve Library initially of 10,000 volumes with study space for 400 students, a curriculum library of 2,000 volumes with study space for 300 students, and an Instructional Resources laboratory. The Education Television Centre in the building includes two small production studios, a conference room, a photographic dark room and laboratory, a large storage room, a graphic arts area and a mobile production unit garage. The Television Centre was initially meant to provide a central facility for the production of University programs “until such time as a separate facility for this purpose can be constructed”. Renovations to the building to accommodate the Music Department were completed prior to 1978 for $730,000. The renovations were designed by architects Forrester, Scott, Bowers, Cooper, and Walls. Tenders for the project were received on April 4, 1975 at which time the contract was awarded to Shoquist Construction. Renovations to the building envelope were completed in 1986 by R & D Construction for $325,918, and were designed by the architectural firm of Scott Bowers. A building envelope is and includes everything that separates the interior of a building from the outdoor environment, including the windows, walls, foundation, basement slab, ceiling, roof, and insulation. In 1990 further renovations to the building were completed by Inter-City Mechanical for $144,686.
Fait partie de University of Saskatchewan Photograph Collection
Looking over the pond toward the main entrance of the Education Building
University of Saskatchewan College of Education Building
Fait partie de University of Saskatchewan Photograph Collection
Exterior of the College of Education building.
Fait partie de Educational Media Access and Production (EMAP) fonds
West side of Education Building - Summer.
Fait partie de Educational Media Access and Production (EMAP) fonds
Education building sign
Fait partie de Educational Media Access and Production (EMAP) fonds
View of Education Building - south east side, main entrance.
Fait partie de Educational Media Access and Production (EMAP) fonds
South-west side of Education Building; Summer.
Fait partie de Educational Media Access and Production (EMAP) fonds
Education building