Sewer and water installation in Rosetown
- GR2.004
- Item
- [ca 1950]
L-R: John Graham, Dr. Abe Handelman, Engineer. Standing in front of dragline digging a trench for a sewer line.
Sewer and water installation in Rosetown
L-R: John Graham, Dr. Abe Handelman, Engineer. Standing in front of dragline digging a trench for a sewer line.
Five women and a young boy hold picket signs demanding the installation of water and sewer on Little Flower Avenue, Sixth and Seventh Avenues West be completed, after a prolonged wait through wintertime. After a rumour spread that construction was about to cease, women protestors painted pickets. L-R: Geraldine Smith, Marguerite (Mary) Lavigne, Irene Driedger, ?, Richard Arsenault, Ruby Arsenault.
Extreme left is Mayor A. Handelman, then Bill Mullen, Clerk. Engineer and workers beside dragline.