Looking southeast at final stages of construction of the Livestock Pavilion; Main Barn construction visible at left.
Bio/Historical Note: The Livestock Pavilion, one of the five original campus buildings, was designed by Brown and Vallance and constructed between 1910-1912. Built of red brick, slate and translucent glass panels (some of which could be opened for ventilation), it included a large show arena with seating. The Pavilion had a slaughter room and cold storage for the butchery courses. It was demolished in 1986.
One man is running a Canadian National steam shovel with "Canadian National 103" printed on the side while seven other men are standing around the steam shovel
Nearly complete Albert Street underpass with workmen posing as they finish sweeping dirt over the bricks on the street.; looking north up Albert Street from South Railway Avenue (now Saskatchewan Drive)
View looking south of concrete skeleton of the Administration Building addition.
Bio/Historical Note: In 1979 portions of the Administration Building (College Building) were declared unsafe. The building that had been at the heart of University life for seven decades was showing its age. A weak roof structure and deteriorating cement precipitated action on the part of the University’s administration. From a number of options available, the choice was made to build a new building adjacent to the original structure. The Administration Building Addition (East Wing) was opened in October 1987, construction having began in the fall of 1985. Designed by Wiens Johnstone Architects of Regina and built by Penn-Co Construction of Calgary, the $6.6 million three-story stone-clad building contained 4,646 square metres of floor space, approximately the same office space as the College Building. The two buildings were directly linked with some of the College Building’s exterior walls in the addition’s interior space.
Crane hoisting metal girders to the top of the faculty office tower, the classroom wing on the left. Man standing on the sidewalk watching the action in the foreground. Trees around the buildings.
Scaffolding built to the top of the building and four floors of girders in place. Construction sign and classrooms on the left with trees and sidewalk in front of the buildings. Clouds in the sky.