View looking north of Physics Building nearing completion. Qu'Appelle Hall visible at left, with Saskatchewan Hall at right. Road leading to Physics in foreground, with small trees newly planted.
View looking north of Physics Building nearing completion. Qu'Appelle Hall visible at left, with Saskatchewan Hall at right. Road leading to Physics in foreground, with small trees newly planted.
Elevated view looking east across the Bowl showing cars on road and people walking on pathways. Campus buildings in background (l to r): Physics Building, College Building, Saskatchewan Hall and Qu'Appelle Hall. Taken from the roof of the Chemistry Building.
Elevated view looking east across the Bowl showing cars on road and people walking on pathways. Campus buildings in background (l to r): Physics Building, College Building, Saskatchewan Hall and Qu'Appelle Hall. Taken from the roof of the Chemistry Building.
View of College Building, Qu'Appelle Hall, Saskatchewan Hall, Physics Building and Engineering Building with the Bowl at centre. Appended is a photograph of Chemistry Building at left of photograph.
Looking north at Physics Building framed between Qu'Appelle Hall (left) and Saskatchewan Hall.
Looking northeast across a stubble field at the Chemistry Building, Physics Building, Saskatchewan Hall, and Qu'Appelle Hall.
View looking north of Physics Building nearing completion. Qu'Appelle Hall visible at left, with Saskatchewan Hall at right. Road leading to Physics Building in foreground.
Looking north, Observatory in the foreground with Thorvaldson (Chemistry), Physics and a corner of the student residences in the distance.
Physical Education Building - Swimming Pool
View of the Physical Education pool.
Students seated in desks listen to an instructor in tiered lecture theatre in Physics; instructor is standing at front. View from back of classroom looking towards instructor.
Bio/Historical Note: A proper addition to the Physics Building was finally completed in 1967 by W.C. Wells Construction for $2,029,876. The Physics Building Addition, designed by Kerr, Cullingworth, Riches and Associates, was initially meant to accommodate a student body of 8,000 for a cost of $750,000. However, the growing demands of the Department during the planning stages led to a drastic increase in the scope of the project. Upon completion the Addition added 36,000 square feet of accommodation to the existing 49,000 in the original Physics Building; the foundations and support columns of the Addition are also designed to support an additional two storeys to the building in future expansions. The basement of the Addition originally housed 20 undergraduate laboratories, each with a proposed capacity of 20 students, four advanced undergraduate labs specializing in Modern Physics, Electronics, Optics and 4th Year studies, and research laboratories for masters and doctoral candidates. As well, main machine, woodworking, students’ and electronic workshops were contained here, as was most of the office space. The building also contained two large lecture theatres and classroom space to accommodate 450 to 500 students. The Addition was restricted to two-storeys so as not to cast shadows on the Biology greenhouses to the north. The exterior of the building was sheathed in greystone, with Tyndall limestone used as window trim, door and window mullions, and as mirror wall panels. Grey slate was used in canopy facings, and in steps and the thresholds to entrances.
Dr. Leon Katz and class in a lecture theatre in the new Physics addition.
Bio/Historical Note: The Physics Building Addition, designed by Kerr, Cullingworth, Riches and Associates, was initially meant to accommodate a student body of 8,000 for a cost of $750,000. However, the growing demands of the Department during the planning stages led to a drastic increase in the scope of the project. Upon completion the Addition added 36,000 square feet of accommodation to the existing 49,000 in the original Physics Building; the foundations and support columns of the Addition are also designed to support an additional two storeys to the building in future expansions. The basement of the Addition originally housed 20 undergraduate laboratories, each with a proposed capacity of 20 students, four advanced undergraduate labs specializing in Modern Physics, Electronics, Optics and 4th Year studies, and research laboratories for masters and doctoral candidates. As well, main machine, woodworking, students’ and electronic workshops were contained here, as was most of the office space. The building also contained two large lecture theatres and classroom space to accommodate 450 to 500 students. The Addition was restricted to two-storeys so as not to cast shadows on the Biology greenhouses to the north. The exterior of the building was sheathed in greystone, with Tyndall limestone used as window trim, door and window mullions, and as mirror wall panels. Grey slate was used in canopy facings, and in steps and the thresholds to entrances.
Students in elementary laboratory in new Physics addition.
Bio/Historical Note: The Physics Building Addition, designed by Kerr, Cullingworth, Riches and Associates, was initially meant to accommodate a student body of 8,000 for a cost of $750,000. However, the growing demands of the Department during the planning stages led to a drastic increase in the scope of the project. Upon completion the Addition added 36,000 square feet of accommodation to the existing 49,000 in the original Physics Building; the foundations and support columns of the Addition are also designed to support an additional two storeys to the building in future expansions. The basement of the Addition originally housed 20 undergraduate laboratories, each with a proposed capacity of 20 students, four advanced undergraduate labs specializing in Modern Physics, Electronics, Optics and 4th Year studies, and research laboratories for masters and doctoral candidates. As well, main machine, woodworking, students’ and electronic workshops were contained here, as was most of the office space. The building also contained two large lecture theatres and classroom space to accommodate 450 to 500 students. The Addition was restricted to two-storeys so as not to cast shadows on the Biology greenhouses to the north. The exterior of the building was sheathed in greystone, with Tyndall limestone used as window trim, door and window mullions, and as mirror wall panels. Grey slate was used in canopy facings, and in steps and the thresholds to entrances.
Physics Building - Addition - Architect's Model
View of model of Physics Addition with minor landscaping. Made by Nik Semenoff, according to The Business Leader, Vol. 1 no.1 August 1964.
Physics Building - Addition - Lobby
Hall lobby in new Physics addition; students sitting in chairs.
Bio/Historical Note: The Physics Building Addition, designed by Kerr, Cullingworth, Riches and Associates, was initially meant to accommodate a student body of 8,000 for a cost of $750,000. However, the growing demands of the Department during the planning stages led to a drastic increase in the scope of the project. Upon completion the Addition added 36,000 square feet of accommodation to the existing 49,000 in the original Physics Building; the foundations and support columns of the Addition are also designed to support an additional two storeys to the building in future expansions. The basement of the Addition originally housed 20 undergraduate laboratories, each with a proposed capacity of 20 students, four advanced undergraduate labs specializing in Modern Physics, Electronics, Optics and 4th Year studies, and research laboratories for masters and doctoral candidates. As well, main machine, woodworking, students’ and electronic workshops were contained here, as was most of the office space. The building also contained two large lecture theatres and classroom space to accommodate 450 to 500 students. The Addition was restricted to two-storeys so as not to cast shadows on the Biology greenhouses to the north. The exterior of the building was sheathed in greystone, with Tyndall limestone used as window trim, door and window mullions, and as mirror wall panels. Grey slate was used in canopy facings, and in steps and the thresholds to entrances.
Physics Building - Construction
Progress shot of Physics Building under construction; scaffolding in front.
Bio/Historical Note: The Physics Building was constructed by Smith Bros. & Wilson General Contractors from 1919 to 1921 for $437,000, and was designed by D. R. Brown and H. Vallance. It was officially opened in 1922. The building originally housed the Departments of Physics, Botany and Zoology, the Plant-pathology section of the Dominion Department of Agriculture, as well as the soils branch of the Canadian Department of the Interior. The Physics Building possessed non-vibratory walls, laboratories for Electricity and Magnetism, Light, Electron Physics, wireless work, a number of smaller research rooms, a dark room and a large lecture theatre, which was quickly put to use by many different colleges. The attic of the building was used as a temporary museum, with meteorological recording equipment situated on the roof. The basement was fitted with offices and classrooms, as well as with two fireproofed rooms containing the Shortt Library of Canadiana.