Affichage de 156 résultats

Archival description
Automobiles√
Aperçu avant impression Affichage :

129 résultats avec objets numériques Afficher les résultats avec des objets numériques

University Hospital

Summer view of main entrance and two side wings of the University Hospital.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health on May 1955. The name was officially changed to Royal University Hospital 23 May 1990.

University Hospital

Summer view, garden with flowers in front of main entrance of the University Hospital.

Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health on May 1955. The name was officially changed to Royal University Hospital 23 May 1990.

Résultats 61 à 75 sur 156