Showing 846 results

Archival description
Prince Albert (Sask.)
Print preview View:

757 results with digital objects Show results with digital objects

The Saskatchewan Anti-Tuberculosis League fonds

  • SATL
  • Fonds
  • 1911-1987

Fonds contains records and photos from the Saskatchewan Anti-Tuberculosis League not directly linked to the sanatoriums. This includes mass surveys, vaccination campaigns, ACT Shows, and other topics pertaining to general operation in the province.

Saskatchewan Anti-Tuberculosis League

The Valley Echo Collection

  • VE
  • Collection
  • [1921-1960]

Collection contains bound copies of the Valley Echo, the monthly publication of the Saskatchewan Anti-Tuberculosis League. Common themes include tuberculosis treatment and prevention, and news from the wards at each of the 3 SATL sanatoriums as recorded by patients.

Saskatchewan Anti-Tuberculosis League

La Colle Falls - men and teams at work

Cordoned off section of river with unidentified men and teams of horses at work. La Colle Falls construction site

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - raising wall

Raising a piece of wall at La Colle Falls with ropes and pulleys. Unidentified workmen

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - on bank construction

View of on bank construction at the La Colle Falls hydroelectric east of Prince Albert

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - lowering a section

View of a concrete or steel section being lowered by a pulley system at La Colle Falls. Unidentified worker atop the section

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls

View of construction at La Colle Falls

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - lowering section

La Colle Falls construction site showing unidentified workmen lowering a section of wall into place with ropes and pulleys

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - lowering section

Lowering a section of wall at the La Colle Falls construction site. Unidentified workmen

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

Results 91 to 105 of 846