Showing 154 results

Archival description
University of Saskatchewan - Engineering Buildings (1912 + 1925)√ With digital objects
Print preview View:

Engineering Building - Interior

Scene inside workshop in Engineering Building. Blacksmith tools like forges, anvils and other equipment standing in rows.

Bio/Historical Note: Walter C. Murray, University President, saw that the College of Agriculture would keep the university close to the life of the people. Between 1909-1912, before they had teaching space, the agriculture faculty developed the agriculture farm and traveled doing extension work, most significantly, with the Better Farming Train. The Saskatchewan Minister of Agriculture, W.R. Motherwell, supported extension work with tax revenue funds. In October 1912, the first agriculture class was taught. Both a 3-year associate course and a degree course were available. In 1937 the associate program became the School of Agriculture. The school responded to local farming problems by teaching and research and with new departments directed to these areas.

Engineering Building - Addition - Architectural Sketch

Architectural sketch of addition to the Engineering Building, showing landscaping and sidewalks.

Bio/Historical Note: In the late 1970s the Engineering Building would go through drastic renovations. In six stages from 1977 to 1983 the entire building was completely overhauled and redesigned. It encompassed the replacement of the original portion of the single storey west wing, the removal of the Storage Building, the construction of additions, and renovations in what remained of the original building. The architectural firm responsible for this redesign was Forrester, Scott and Bowers, and the total cost of the project would eventually surpass $13 million. The reconstruction began in 1977. It included the demolition of the old central heating and power plant, the construction of additions to house the Hardy Lab and central shops, and the relocation of a small section serving the Department of Geological Sciences. The second phase included the demolition of a one-storey wing of the building which adjoined the Hardy Lab, and its replacement with a larger three-story structure. A second storey was then built over the office section of the Hardy Lab, which was also renovated. The first phase of demolition work was carried out by CEL Contracting for $136,000 while the second was performed by Roscoe Enterprises for $39,626. The majority of the reconstruction itself was performed by Cana Construction for $1,012,730.

Greenhouses

View of greenhouses in centre foreground of image. University buildings in background are l to r: outer edge of Administration Building, Engineering Building, Livestock Pavilion, and Main Barn. Flowering shrubs in foreground.

Campus - Scenic

View looking east of University buildings (l to r): Engineering Building, Rutherford Rink, Livestock Pavilion, Main Barn (Animal Husbandry Building in front), and National Research Council. Parking lot in front of Engineering Building; cars parked on road in foreground.

Engineering - Original Blocks from 1st Avenue

Numbered concrete bricks or blocks sitting in a pile in front of the Engineering Building. Information from A-4756: "Original blocks put in at site 1st Ave - 22nd-23rd taken out in 1928 when Massey Harris Bldg put up."

Bio/Historical Note: A three-storey concrete Massey Ferguson farm machinery warehouse operated in Saskatoon from 1929-1959 at 105 1st Avenue North. The building served a number of other uses until it was demolished in 1973. The Hilton Garden Inn Hotel now stands on the site (2021).

Results 76 to 90 of 154