- RG2024-2006-086-1401
- Item
- 1983
Parte de Educational Media Access and Production (EMAP) fonds
View of engineering building
139 resultados com objetos digitais Mostrar resultados com objetos digitais
Parte de Educational Media Access and Production (EMAP) fonds
View of engineering building
Parte de Educational Media Access and Production (EMAP) fonds
Engineering building in winter
Parte de Educational Media Access and Production (EMAP) fonds
Engineering building
Graffiti prank by law students against the engineering students. First photograph depicts a close up of an eagle painted onto the brick wall of the engineering building and a sign which reads: " Here's to the legal eagle, that great & glorious bird. Here's to the engineering building where our eagle drops his t---!" Second photo shows the front of the Engineering Building, on which the words "Law Cabaret Dec 21" and more eagles are panted.
[University Farm building] - Construction
View looking west of construction of [University Farm building]. Original Engineering Building at centre.
Engineering Building - Addition - Architectural Sketch
Architectural sketch of addition to the Engineering Building, showing landscaping and sidewalks.
Bio/Historical Note: In the late 1970s the Engineering Building would go through drastic renovations. In six stages from 1977 to 1983 the entire building was completely overhauled and redesigned. It encompassed the replacement of the original portion of the single storey west wing, the removal of the Storage Building, the construction of additions, and renovations in what remained of the original building. The architectural firm responsible for this redesign was Forrester, Scott and Bowers, and the total cost of the project would eventually surpass $13 million. The reconstruction began in 1977. It included the demolition of the old central heating and power plant, the construction of additions to house the Hardy Lab and central shops, and the relocation of a small section serving the Department of Geological Sciences. The second phase included the demolition of a one-storey wing of the building which adjoined the Hardy Lab, and its replacement with a larger three-story structure. A second storey was then built over the office section of the Hardy Lab, which was also renovated. The first phase of demolition work was carried out by CEL Contracting for $136,000 while the second was performed by Roscoe Enterprises for $39,626. The majority of the reconstruction itself was performed by Cana Construction for $1,012,730.
Engineering Building and Power House - Construction
View of Engineering Building under construction in foreground, with Power House construction in background. In immediate foreground is tunnel which ran laterally to the main line from Power House to College Building.
Northwest Territories - Ceremonial Mace
Parte de Institute for Northern Studies fonds
Ceremonial mace from NWT on display during Engineering Show, Engineering Building, University of Saskatchewan, 1967.
[Displays and Exhibits] - Classroom - Interior
Parte de Institute for Northern Studies fonds
Interior of classroom prepared for slide show during the Engineering Show, Engineering Building, University of Saskatchewan, 1970.
Engineering Building - Official Opening - Engineering 70th Anniversary
Dr. Leo F. Kristjanson, University President, speaks at the official opening of the Engineering Building during the College of Engineering 70th anniversary celebrations. Audience in foreground; dignitaries seated on dais.
Saskatchewan Agricultural Societies - Hanley
Group photo of Hanley Society members standing in front of the Engineering Building during a visit to campus. Field Husbandry Building at left; cars in background.
Engineering Building - Exterior
Looking north at the Engineering Building; cars parking in front.
Returned Soldiers - Training - Group Photo
Returned men standing in front of Engineering Building; winter scene.
Returned Soldiers - Training - Group Photo
Returned men seated in tiers on benches in [Engineering Building].
Returned men standing with farm machinery in front of Engineering Building.