Returned Soldiers - Training - Group Photo
- A-2980
- Item
- Feb. 1918
Returned men, taking a short course, stand in front of the Engineering Building; winter scene.
139 resultados com objetos digitais Mostrar resultados com objetos digitais
Returned Soldiers - Training - Group Photo
Returned men, taking a short course, stand in front of the Engineering Building; winter scene.
Engineering Building - Addition - Architectural Sketch
Architectural sketch of Engineering Building with proposed extension drawn in with pen.
Bio/Historical Note: The modern day Engineering Building was built on the foundations of the original Engineering Building which was destroyed by fire 13 March 1925. Construction began the following June with an expected completion date of 1 November 1926. Gentil J.K. Verbeke of Saskatoon designed the new building, which was initially budgeted at $277,150. In reality the project would run well into February 1926 and eventually cost $304,169.65. The still uncompleted Engineering Building was occupied by the college in January 1926. Similar in design to its predecessor, the new Engineering Building featured a few noteworthy improvements. These included skylights for the top floor and individual lights for the draughting tables, a smoking lounge for students, and a new library and reading room. The new building contained 89,000 gross square feet of space, and also housed the dean and assistant dean’s offices, about 15 staff offices, drafting rooms, several lecture rooms, laboratories and postgraduate student offices. In 1939 the west wing of the new building was extended northward to house the Mechanical Engineering laboratories and the welding shop. An extension of the tractor lab was completed on 7 February 1941 for $33,188.60. The extension was designed by Gentil J.K. Verbeke and was built by Shannon Bros. Construction. A full addition to the west wing also designed by Verbeke was completed in 1946 by W. C. Wells Contractors for $31,890. The official opening of the west wing took place on 10 February 1948. In 1949 a World War II Air Force hangar was adjoined to the building to provide “temporary” space for the college. In the fall of 1961 the Evan A. Hardy Laboratory was completed as part of greater construction on the building. The laboratory project included extensive space for the Department of Agricultural Engineering, the Agricultural Engineering Research and Development Section and the Divisions of Hydrology and Control Systems. The project was completed in 1963 for $611,761; it was constructed by W.C. Wells Construction. The lab was designed by architect J. K. Verbeke while the further addition was designed by the architectural firm of Webster, Forrester and Scott. In the late 1970s the Engineering Building would undergo drastic renovations.
Engineering Building - Construction
Early view of construction of new Engineering Building.
Bio/Historical Note: The modern day Engineering Building was built on the foundations of the original Engineering Building which was destroyed by fire 13 March 1925. Construction began the following June with an expected completion date of 1 November 1926. Gentil J.K. Verbeke of Saskatoon designed the new building, which was initially budgeted at $277,150. In reality the project would run well into February 1926 and eventually cost $304,169.65. The still uncompleted Engineering Building was occupied by the college in January 1926. Similar in design to its predecessor, the new Engineering Building featured a few noteworthy improvements. These included skylights for the top floor and individual lights for the draughting tables, a smoking lounge for students, and a new library and reading room. The new building contained 89,000 gross square feet of space, and also housed the dean and assistant dean’s offices, about 15 staff offices, drafting rooms, several lecture rooms, laboratories and postgraduate student offices. In 1939 the west wing of the new building was extended northward to house the Mechanical Engineering laboratories and the welding shop. An extension of the tractor lab was completed on 7 February 1941 for $33,188.60. The extension was designed by Gentil J.K. Verbeke and was built by Shannon Bros. Construction. A full addition to the west wing also designed by Verbeke was completed in 1946 by W. C. Wells Contractors for $31,890. The official opening of the west wing took place on 10 February 1948. In 1949 a World War II Air Force hangar was adjoined to the building to provide “temporary” space for the college. In the fall of 1961 the Evan A. Hardy Laboratory was completed as part of greater construction on the building. The laboratory project included extensive space for the Department of Agricultural Engineering, the Agricultural Engineering Research and Development Section and the Divisions of Hydrology and Control Systems. The project was completed in 1963 for $611,761; it was constructed by W.C. Wells Construction. The lab was designed by architect J. K. Verbeke while the further addition was designed by the architectural firm of Webster, Forrester and Scott. In the late 1970s the Engineering Building would undergo drastic renovations.
Engineering - Original Blocks from 1st Avenue
Numbered concrete bricks or blocks sitting in a pile in front of the Engineering Building. Information from A-4756: "Original blocks put in at site 1st Ave - 22nd-23rd taken out in 1928 when Massey Harris Bldg put up."
Bio/Historical Note: A three-storey concrete Massey Ferguson farm machinery warehouse operated in Saskatoon from 1929-1959 at 105 1st Avenue North. The building served a number of other uses until it was demolished in 1973. The Hilton Garden Inn Hotel now stands on the site (2021).
Engineering - Original Blocks from 1st Avenue
Numbered concrete bricks or blocks sitting in a pile in front of the Engineering Building. Information from A-4756: "Original blocks put in at site 1st Ave - 22nd-23rd taken out in 1928 when Massey Harris Bldg put up."
Bio/Historical Note: A three-storey concrete Massey Ferguson farm machinery warehouse operated in Saskatoon from 1929-1959 at 105 1st Avenue North. The building served a number of other uses until it was demolished in 1973. The Hilton Garden Inn Hotel now stands (2020) on the site.
Engineering - Original Blocks from 1st Avenue
Numbered concrete bricks or blocks sitting in a pile in front of the Engineering Building. Information from A-4756: "Original blocks put in at site 1st Ave - 22nd-23rd taken out in 1928 when Massey Harris Bldg put up."
Bio/Historical Note: A three-storey concrete Massey Ferguson farm machinery warehouse operated in Saskatoon from 1929-1959 at 105 1st Avenue North. The building served a number of other uses until it was demolished in 1973. The Hilton Garden Inn Hotel now stands (2020) on the site.
Engineering Building - Exterior
Damage done to exterior of the Engineering Building after a hailstorm.
Bio/historical note: The original Engineering Building was destroyed by fire on Friday, 13 March 1925.
Old Carpenter Shop in Original Engineering Building
Men standing in a carpentry shop surrounded by machinery and tools. Names on back of photo from left: Tom Hallett, carpenter; George Dixon, carpenter, ? Morrison; Walter Coppings, father-in-law; W.E. McClelland, chief engineer; Jack Smith, janitor; A.V. Copping, general foreman; Wm. Davies, machinist.
Engineering Building - Construction
Brickwork almost completed during construction of the Engineering Building.
Bio/historical note: The original Engineering Building was destroyed by fire on Friday, 13 March 1925.
Engineering Building - Exterior
View of first Engineering Building shortly after completion; winter scene.
Engineering Building - Exterior
View of first Engineering Building shortly after completion.
Engineering Building - Exterior
View of first Engineering Building shortly after completion.
Parte de Office of Communications fonds
Construction next to the Engineering building (Chemical Engineering wing site)
Parte de Educational Media Access and Production (EMAP) fonds
Model of engineeering building
Parte de Educational Media Access and Production (EMAP) fonds
Distant view of engineering building