Cut through the watertank at Mohenjo Daro
- WOK 1-12
- Item
- [1952-1954]
Part of W.O. Kupsch fonds
Diagram of a cut through an excavated watertank at Mohenjo Daro. Diagram copied from a book.
8 results with digital objects Show results with digital objects
Cut through the watertank at Mohenjo Daro
Part of W.O. Kupsch fonds
Diagram of a cut through an excavated watertank at Mohenjo Daro. Diagram copied from a book.
Civic Centre, Moose Jaw, Saskatchewan
Part of MJ General Photograph Collection
The Civic Centre in Moose Jaw, Saskatchewan
Fartak, Joe
Series consists of plans and maps relating to building sites in Moose Jaw, Regina, and Saskatoon.
Series consists of building plans and blueprints for various churches, additions, and proposed related constructions in Saskatchewan. Contents include items relating to: Avonlea, Camp McKay and Round Lake Mission, Moose Mountain and Carlyle, Carievale, Frontier (Climax Pastoral Charge), Goodwater, Grenfell (Sakimay United), Keeler, LaFleche, Leader, Moose Jaw (Grandview and Minto United), Regina (Carmichael Presbyterian/United, Hillsdale United, St. James United, Whitmore Park United), Rockglen, Semans, Sceptre, Sintalute, Wapella, and an unidentified church (J. Wright, ca.1960) near the Radway Lumber Co.
Bitumen jointed masonry of temple of Ur of the Chaldees
Part of W.O. Kupsch fonds
Photograph of bitumen jointed masonry of the temple of Ur of the Chaldees. Photograph copied from a book.
The fonds consist of Alex Balych's CJNB papers (25 scripts and year-round reviews), Northwest Economic Council (NEDC) correspondence, School papers North Battleford School District #1438 (correspondence and reports), Pearl Balych photographs (200) and textual records, Dance Festival programs 1964-1968, 1970-1990, Radio scripts 1963-1965.
Balych Family
Artist's drawing of Regina Hospital
Part of City of Regina fonds
Photograph of the artist's drawing of Regina General Hospital from [1910?].
Architectural Plans and Drawings collection
The collection primarily consists of records relating to the building of various churches, manses and other features associated with the United Church, in Saskatchewan. Contents include architectural plans and blueprints (as well as proposed designs) for church and manse buildings and building sites.
Administration Building - Addition - Architectural Plans
"Proposed Ground Floor Furniture Layout" of the Administration Building addition.
Bio/Historical Note: In 1979 portions of the Administration Building (College Building) were declared unsafe. The building that had been at the heart of University life for seven decades was showing its age. A weak roof structure and deteriorating cement precipitated action on the part of the University’s administration. From a number of options available, the choice was made to build a new building adjacent to the original structure. The Administration Building Addition (East Wing) was opened in October 1987, construction having began in the fall of 1985. Designed by Wiens Johnstone Architects of Regina and built by Penn-Co Construction of Calgary, the $6.6 million three-story stone-clad building contained 4,646 square metres of floor space, approximately the same office space as the College Building. The two buildings were directly linked with some of the College Building’s exterior walls in the addition’s interior space.
Administration Building - Addition - Architectural Plans
"First Floor Plan" of the Administration Building addition.
Bio/Historical Note: In 1979 portions of the College Building were declared unsafe. The building that had been at the heart of University life for seven decades was showing its age. A weak roof structure and deteriorating cement precipitated action on the part of the University’s administration. From a number of options available, the choice was made to build a new building adjacent to the original structure. The Administration Addition was opened in October of 1987, construction having began in the fall of 1985. Designed by Wiens Johnstone Architects of Regina and built by Penn-Co Construction of Calgary, the $6.6 million three-story stone-clad building contained 4,646 square metres of floor space, approximately the same office space as the College Building. The two buildings were directly linked with some of the College Building’s exterior walls in the addition’s interior space.
Administration Building - Addition - Architectural Plans
"Proposed Second Floor Furniture Layout" of the Administration Building addition.
Bio/Historical Note: In 1979 portions of the College Building were declared unsafe. The building that had been at the heart of University life for seven decades was showing its age. A weak roof structure and deteriorating cement precipitated action on the part of the University’s administration. From a number of options available, the choice was made to build a new building adjacent to the original structure. The Administration Addition was opened in October of 1987, construction having began in the fall of 1985. Designed by Wiens Johnstone Architects of Regina and built by Penn-Co Construction of Calgary, the $6.6 million three-story stone-clad building contained 4,646 square metres of floor space, approximately the same office space as the College Building. The two buildings were directly linked with some of the College Building’s exterior walls in the addition’s interior space.