Aperçu avant impression Fermer

Affichage de 271 résultats

Archival description
Gibson Photo
Aperçu avant impression Affichage :

73 résultats avec objets numériques Afficher les résultats avec des objets numériques

Department of Chemical Engineering - Research

Note on back of photograph: "Dandina Nagarajo Rao (left) assembled the pilot plant in a chemical engineering laboratory at the U of S before taking it by truck to Prince Albert. Here, he discusses the plant's operation with Profs. N.N. Bakhshi (centre) and Doug Macdonald. The two containers at the top receive effluent from the pulp mill's bleach plant, the one on the left highly colored caustic effluent and the one on the right acid-containing effluent goes into the bottom right container where the fly ash is introduced. The acidified fly ash is then piped across to the bottom left container to treat the caustic effluent, which flows in from the top left container".

Faculty - Retirement Banquet - Group Photo

Image of seven University of Saskatchewan faculty members honoured at the retirement banquet sponsored by the Faculty Club at Marquis Hall. Front row (L to R): Emrys Jones; J.D.F. Beattie; and Murray Adaskin. Back row (L to R): J.W. Paul; C.E. Miller; Dr. B. Fleming; T.J. Arnason; and D.R. Robinson.

Campus - Aerial Layout

View looking southwest with Arts Tower at centre of image; campus buildings in foreground. College Drive runs along left of photograph. East side residential areas, 25th Street Bridge, river and downtown area in background.

Health Sciences Building - Official Opening

View of crowd assembled for the official opening of the Health Sciences Building B Wing. Construction of south wing of Murray Memorial (Main) Library in background.

Bio/Historical Note: The oldest wing of the Health Sciences Building, the A Wing, dating to 1949, was originally the Medical College Building. The Health Sciences A Wing has heritage value as the cornerstone of the medical precinct at the university and was designed by architects Webster and Gilbert. The A Wing was renovated and reopened in 2019. The B Wing was completed by 1971.

Résultats 16 à 30 sur 271