Engineering Building - Addition - Exterior
- A-9079
- Stuk
- Sept. 1977
Image of exterior of Engineering Building Addition.
154 results with digital objects Show results with digital objects
Engineering Building - Addition - Exterior
Image of exterior of Engineering Building Addition.
Engineering Building - Addition - Construction
View of early stages of construction of the Engineering Building addition.
Bio/Historical Note: In the late 1970s the Engineering Building would go through drastic renovations. In six stages from 1977 to 1983 the entire building was completely overhauled and redesigned. It encompassed the replacement of the original portion of the single storey west wing, the removal of the Storage Building, the construction of additions, and renovations in what remained of the original building. The architectural firm responsible for this redesign was Forrester, Scott and Bowers, and the total cost of the project would eventually surpass $13 million. The reconstruction began in 1977. It included the demolition of the old central heating and power plant, the construction of additions to house the Hardy Lab and central shops, and the relocation of a small section serving the Department of Geological Sciences. The second phase included the demolition of a one-storey wing of the building which adjoined the Hardy Lab, and its replacement with a larger three-story structure. A second storey was then built over the office section of the Hardy Lab, which was also renovated. The first phase of demolition work was carried out by CEL Contracting for $136,000 while the second was performed by Roscoe Enterprises for $39,626. The majority of the reconstruction itself was performed by Cana Construction for $1,012,730.
Engineering Building - Exterior
Image of Engineering Building with Crop Science Building fairly visible at left. Rutherford Rink and University elevator visible at right.
Group photo of club members and instructors standing in front of Engineering Building at University of Saskatchewan.
University of Saskatchewan Open House
High school students get a tour of the Engineering Building during the University Open House.
University of Saskatchewan Open House
High school students observe equipment during a tour of the Engineering Building during the University Open House.
University of Saskatchewan Open House
High school students look at a model of a dam during a tour of the Engineering Building held during the University Open House.
University of Saskatchewan Open House
High school students look at an unidentified model during a tour of the Engineering Building held during the University Open House.
View looking southwest with Physical Education Building, Engineering Building and Rutherford Rink near centre of image.
Part of A.S. Morton fonds
A group of Returned Soldiers in the Engineering Building.
Part of A.S. Morton fonds
A group of Returned Soldiers in front of the Engineering Building.
Returned soldiers taking machine shop.
Part of A.S. Morton fonds
A group of returned soldiers taking machine shop pose for the camera in the Engineering Building.
Group photo of club members in the Bowl at University of Saskatchewan. Physics Building, Engineering Building, Administration Building, and Saskatchewan Hall in background.