144 results directly related Exclude narrower terms

La Colle Falls - on bank construction

View of on bank construction at the La Colle Falls hydroelectric east of Prince Albert

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - "operations on north shore"

View of operations on the north shore of the North Saskatchewan River at the La Colle Falls construction project. Two towers, various buildings and scaffolding

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - lowering a section

View of a concrete or steel section being lowered by a pulley system at La Colle Falls. Unidentified worker atop the section

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - lowering a piece of equipment

View of a piece of machinery being lowered by a pulley system at La Colle Falls

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - "looking south from jail towers"

View of dam site construction from "jail towers." Uncertain what this means (Prince Albert jails were not in the vicinity, possibly a nickname?)

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - construction

View of dam site construction including concrete, earth and wood protruding into river

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - dam construction building

View of construction building and part of dam in foreground

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - construction camp

View of dam site construction camp apparently from a boat or platform mid river

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls

View of line carrying load over dam site construction

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - "framework n. wall of lock"

View of construction on the framework for the North wall of the dam lock. Unidentified workers can be seen

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - "n. wall of lock"

View of North wall of lock construction

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls

View of dam construction

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - "looking downstream"

Looking downstream from La Colle falls

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - camp scene

View of laundry hanging next to a building, possibly living quarters, at La Colle Falls construction site

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society

La Colle Falls - "Clarke and Cole grader outfit"

View of the Clarke and Cole grader outfit at La Colle Falls

Bio/historical note: The Ruins at La Colle Falls - At the turn of the 20th century, the City of Prince Albert undertook an ambitious project to generate hydroelectric energy on the North Saskatchewan River by erecting a large turbine dam. Due to some logistical and engineering problems, the project was abandoned in 1914 only five years after construction first began. The city of Prince Albert nearly went bankrupt trying to pay off the $3 million white elephant. It would take half a century to pay off the debt. Today, all that remains of the massive construction project is a concrete labyrinth on the banks of the river east of Prince Albert. Travel to the site is not advised as the road is not maintained. Those choosing to proceed to the site do so at their own risk, as per the Virtual Prince Albert tourist website: http://www.virtualprincealbert.com/lacolle.htm (accessed March 10, 2010). These particular photographs were taken by an unidentified Engineer working on the project and donated by Prince Albert City Hall to the Prince Albert Historical Society