Pièce A-9078 - Engineering Building - Addition - Construction

Zone du titre et de la mention de responsabilité

Titre propre

Engineering Building - Addition - Construction

Dénomination générale des documents

  • Document graphique

Titre parallèle

Compléments du titre

Mentions de responsabilité du titre

Notes du titre

Niveau de description

Pièce

Cote

A-9078

Zone de l'édition

Mention d'édition

Mentions de responsabilité relatives à l'édition

Zone des précisions relatives à la catégorie de documents

Mention d'échelle (cartographique)

Mention de projection (cartographique)

Mention des coordonnées (cartographiques)

Mention d'échelle (architecturale)

Juridiction responsable et dénomination (philatélique)

Zone des dates de production

Date(s)

  • May 1979 (Production)

Zone de description matérielle

Description matérielle

4 negatives : b&w ; 5.5 x 5.5 cm

Zone de la collection

Titre propre de la collection

Titres parallèles de la collection

Compléments du titre de la collection

Mention de responsabilité relative à la collection

Numérotation à l'intérieur de la collection

Note sur la collection

Zone de la description archivistique

Historique de la conservation

Portée et contenu

Images of the addition to the Engineering Building under construction.

Bio/Historical Note: In the late 1970s the Engineering Building would go through drastic renovations. In six stages from 1977 to 1983 the entire building was completely overhauled and redesigned. It encompassed the replacement of the original portion of the single storey west wing, the removal of the Storage Building, the construction of additions, and renovations in what remained of the original building. The architectural firm responsible for this redesign was Forrester, Scott and Bowers, and the total cost of the project would eventually surpass $13 million. The reconstruction began in 1977. It included the demolition of the old central heating and power plant, the construction of additions to house the Hardy Lab and central shops, and the relocation of a small section serving the Department of Geological Sciences. The second phase included the demolition of a one-storey wing of the building which adjoined the Hardy Lab, and its replacement with a larger three-story structure. A second storey was then built over the office section of the Hardy Lab, which was also renovated. The first phase of demolition work was carried out by CEL Contracting for $136,000 while the second was performed by Roscoe Enterprises for $39,626. The majority of the reconstruction itself was performed by Cana Construction for $1,012,730.

Zone des notes

État de conservation

Source immédiate d'acquisition

Classement

Langue des documents

Écriture des documents

Localisation des originaux

Disponibilité d'autres formats

Restrictions d'accès

There are no restrictions on access.

Délais d'utilisation, de reproduction et de publication

Photographer: Unknown

Copyright holder: Unknown

Copyright expires: Unknown

Other terms: The researcher is responsible for obtaining copyright permission.

Instruments de recherche

Éléments associés

Éléments associés

Accruals

Location note

Neg. Vol. 12

Identifiant(s) alternatif(s)

Zone du numéro normalisé

Numéro normalisé

Mots-clés

Mots-clés - Sujets

Mots-clés - Lieux

Mots-clés - Genre

Zone du contrôle

Accession area

Sujets associés

Lieux associés

Genres associés