- RG2024-2006-086-797
- Item
- 1983
Part of Educational Media Access and Production (EMAP) fonds
Thorvaldson building in summer light
Part of Educational Media Access and Production (EMAP) fonds
Thorvaldson building in summer light
Part of Educational Media Access and Production (EMAP) fonds
Thorvaldson building in summer. Dog in foreground.
Part of Educational Media Access and Production (EMAP) fonds
Thorvaldson building in winter, surrounded by hoar frost
Part of Educational Media Access and Production (EMAP) fonds
Thorvaldson building in winter, surrounded by hoar frost
Part of Office of Communications fonds
Backhoe digging in from of the Thorvaldson Building; pipes; workers
Part of Educational Media Access and Production (EMAP) fonds
Roof top and upper level of Arts and Thorvaldson Buildings with cloud formation.
Part of Educational Media Access and Production (EMAP) fonds
Roof top and upper level of Arts and Thorvaldson Buildings with cloud formation.
University Hospital - Construction
View of the start of construction of the University Hospital. Included are boulders and a storage shed. Thorvaldson Building in the background.
Bio/historical note: Designed by Webster and Gilbert, architects, and built between 1948 and 1955 by Smith Bros. and Wilson, contractors, at a cost of $7,000,000.00, the 6-storey, 7-wing University Hospital was officially opened by Bentley, T.J., Saskatchewan Minister of Health on May 1955.The name was officially changed to Royal University Hospital 23 May 1990.
View of Arts building from top of Thorvaldson
Part of Educational Media Access and Production (EMAP) fonds
View of Arts building as seen from roof of Thorvaldson
View of campus across the bowl
Part of Educational Media Access and Production (EMAP) fonds
Summer scenic - students walking past the Bowl with Arts Tower and Thorvaldson Building in the background.